  • steelb

    Member
    June 16, 2020 at 2:23 am

    I’m able to hook into a chiller @40 deg. Any idea who might make one commercially? I really dont have the time to fab one up.

  • golden beaver distillery

    Member
    June 16, 2020 at 3:13 pm

    Check with @Southernhighlander 

  • southernhighlander

    Member
    June 16, 2020 at 3:16 pm

    SteelB.  Is your pot open to or closed top with a manway?  If it has a manway, what is the size of the opening?

     

    Thanks.

  • steelb

    Member
    June 16, 2020 at 7:45 pm

    close top i can do 14 inches straight down in. the hole itself is bigger but its angled on the side so if i followed the angle i would hit the propeller.

  • southernhighlander

    Member
    June 17, 2020 at 12:16 am

    SteelB,

    How far in can a 12″ diameter coil go below the top of the mash?

  • steelb

    Member
    June 17, 2020 at 2:01 pm

    it can go down 32 inches to the bottom of the pot

  • southernhighlander

    Member
    June 17, 2020 at 3:51 pm

    I think that your best option is a stand alone tube in tube heat exchanger, or one of my mash tuns with the internal cooling coil.  Email or call for pricing.  417-778-6100 paul@distillery-equipment.com

     

  • mg thermal consulting

    Member
    June 17, 2020 at 10:06 pm

    See the photo to the left, an example of a closed loop glycol hybrid cooler which needs city water in summer to augment cooling .  This one is similar to a project just finished  that I’ll have photos from a 1,000 Gal setup of next week.  If I have your zip code and how many hours to want it cooled by, I can get one on about 4 weeks for you that would pump right in through a heat exchanger and back until reaching the set point desired. Large reservoir not needed

    Add a water to glycol heat exchanger and you can make cold water during winter and off seasons for the still cooling.

  • steelb

    Member
    July 1, 2020 at 11:04 pm

    didnt see any pics but if you PM me i can give you my email addy and we can get it moving forward, because hauling 6 barrels of ice up a ladder every week is getting old lol

  • mg thermal consulting

    Member
    July 2, 2020 at 1:43 pm

    i meant the photo on  my ID. lol.  Requests for literature can be emailed to me at mikegronski@gmail.com.